Technology pre-installation in new builds: what to plan for
During construction, running a conduit costs very little. Once it's finished, it costs a lot. Here's what's worth preparing, even if not everything is installed on day one.
1. A place for the rack
Set aside a ventilated, accessible space (technical cupboard, garage, utility room) where the fibre, power and all network cables arrive. It's the heart of the installation.
2. Network cabling in every room
At least one network point (Cat 6 or 6A) in each bedroom, living area, office and behind the main TV. It's the foundation for computers, TVs and future devices.
3. Ceiling WiFi
Leave network outlets in the ceiling where WiFi access points will go (corridors, living areas, each floor). They're powered over the same cable (PoE) and stay discreet.
4. Home automation first fix
Depending on the system chosen (KNX, Loxone…), plan the bus cable or runs to switches, motorised blinds and sensors, plus a distribution board with space for actuators.
5. Security
- Points for outdoor and entrance cameras (PoE).
- IP video intercom at the entrance.
- Conduit for a siren and wired sensors if needed.
6. Outdoor areas and garage
Outdoor WiFi, cameras, automated garage door and, where relevant, garden lighting and irrigation.
7. Spare conduits
Leave empty conduits between floors and to areas whose future use is uncertain. It's the cheapest and most useful investment.
Tip: involve the integrator before the electrical design is finalised. Coordinating with the electrician avoids duplication and surprises.
Frequently asked questions
Can I do the pre-installation now and the automation later?
Yes. It's a very common approach: conduits and rack now, equipment when the budget allows.
Connect · Protect · Automate · Control
Tell us about your project
We look at what you need and propose a complete solution: one company, one point of contact, one project.
- Phone+376 356 249
- Emailinfo@knxandorra.com