Technology pre-installation in new builds: what to plan for

During construction, running a conduit costs very little. Once it's finished, it costs a lot. Here's what's worth preparing, even if not everything is installed on day one.

Guide · 6 min read · Updated

1. A place for the rack

Set aside a ventilated, accessible space (technical cupboard, garage, utility room) where the fibre, power and all network cables arrive. It's the heart of the installation.

2. Network cabling in every room

At least one network point (Cat 6 or 6A) in each bedroom, living area, office and behind the main TV. It's the foundation for computers, TVs and future devices.

3. Ceiling WiFi

Leave network outlets in the ceiling where WiFi access points will go (corridors, living areas, each floor). They're powered over the same cable (PoE) and stay discreet.

4. Home automation first fix

Depending on the system chosen (KNX, Loxone…), plan the bus cable or runs to switches, motorised blinds and sensors, plus a distribution board with space for actuators.

5. Security

  • Points for outdoor and entrance cameras (PoE).
  • IP video intercom at the entrance.
  • Conduit for a siren and wired sensors if needed.

6. Outdoor areas and garage

Outdoor WiFi, cameras, automated garage door and, where relevant, garden lighting and irrigation.

7. Spare conduits

Leave empty conduits between floors and to areas whose future use is uncertain. It's the cheapest and most useful investment.

Tip: involve the integrator before the electrical design is finalised. Coordinating with the electrician avoids duplication and surprises.

Frequently asked questions

Can I do the pre-installation now and the automation later?

Yes. It's a very common approach: conduits and rack now, equipment when the budget allows.